Notice: Our website address has changed from aerospace.honeywell.com to honeywellaerospace.com. While existing links will redirect, please update your bookmarks over time. The site is undergoing maintenance and you may experience intermittent issues.
Attention: On Friday, April 17th from 10:00 PM EST to Saturday, April 18th, 09:00 PM EST, we will be undergoing scheduled maintenance to ensure all systems are flight ready. During this period, selected applications within the Customer Portal will experience temporary unavailability.
×

Your browser is not supported.

For the best experience, please access this site using the latest version of the following browsers:

Close This Window

By closing this window you acknowledge that your experience on this website may be degraded.

Power and Thermal Management System Combat-Proven Upgrade-Ready

PTMS designed to grow with the mission

One system. 14 mission-critical functions.

Honeywell’s Power and Thermal Management System (PTMS) is not just another F-35 subsystem—it’s the aircraft’s circulatory system. In addition to supplying cooling, PTMS supports 13 other mission, and safety-critical functions, all  requiring extensive integration and software qualification. 
Check out some of PTMS’ critical functions.

PTMS for the F-35: The Proven Choice

Honeywell's Power & Thermal Management System is the trusted solution for the F-35 Lightning II.
Economically retrofittable. Minimally invasive. Future-Ready.

Aircraft equipped
 

1,185+

Honeywell Aviation Safety Technology | Aircraft icon
Honeywell Aviation Safety Technology | Aircraft icon

Flight hours logged
 

1 million+

Honeywell Aviation Safety Technology | Safety Chart Going Up icon
Honeywell Aviation Safety Technology | Safety Chart Going Up icon

Operational depots maintaining readiness

8

Honeywell Aviation Safety Technology | Safe Flight icon
Honeywell Aviation Safety Technology | Safe Flight icon

Hardware reuse
with upgrade 

95%

1,200+

 Aircraft
Equipped

1 million+

Flight Hours
Logged  

8

Operational Depots
Maintaining Readiness

95%

Hardware Reuse
with Upgrade

PROVEN
PERFORMANCE

 

With over 1 million flight hours, Honeywell's
Power & Thermal Management System is the trusted solution for the F-35 Lightning II. It's combat-proven and upgrade-ready. Avoid the $7 billion cost increase of a high-risk redesign. Stick with what works for the taxpayer and warfighter.

PTMS Myth Busting

PTMS is the only fielded system of its kind, enabling 1,200+ jets with over 1 million proven flight hours across global fleets.
 
MYTH PTMS degrades engine life.

*click to find the fact*

 
FACT PTMS meets all Lockheed Martin requirements, including for engine bleed air. The Government established a different bleed air requirement for Pratt & Whitney F135’s design.
 
MYTH PTMS can’t keep up.

*click to find the fact*

 
FACT PTMS can deliver 80kW cooling capacity with 95% of existing hardware. A software upgrade enables 40kW by 2029 and reduces bleed air by up to 41% to immediately extend engine life.
 
MYTH Clean-sheet drop-in is easy.

*click to find the fact*

 
FACT Integrating a clean-sheet system would be massively complex. All 14 PTMS functions would require recertification. Upgrading PTMS only modifies one function; the rest is unchanged.
 
MYTH Replacing PTMS saves money.

*click to find the fact*

 
FACT A clean-sheet system adds $7B+ in cost, delays capabilities, and doubles the global supply chain and sustainment infrastructure.

The Upgrade vs. Clean-Sheet Choice

Upgrading Honeywell’s PTMS keeps the F-35 mission-ready, cost-effective, and future-proof, without disrupting global supply chain and logistics infrastructure.
Proven and Integrated
  •  The heart and circulatory system of the F-35 Lightning II.
  • Replaces 4 systems with 1: reduces aircraft weight by 1,000 lbs and length by 10 inches.
  •  Performs 14 safety and mission-critical functions, all tested, all qualified, and integrated.
  • 95% hardware reuse, 80% software reuse. No major reintegration needed.
Ready for Block 4 and Beyond
  • Cooling upgrade path already mapped.
  • Phase 1 – Software: 40kW by 2029 and immediate engine overhaul cost savings with up to 41% bleed air reduction.
  • Phase 2 – Hardware: Path to 80kW objective with 95% hardware, minimizing development and retrofit costs, reducing risk, and preserving mission readiness.
  • All hardware/software upgrades are TRL 7+, mature and ready for EMD.
Avoid Unnecessary Clean-Sheet Risk
  • $7B+ lifecycle cost increase.
  • Requalification of all 14 PTMS functions.
  • Doubling logistics burden across parts, tools, training, depots, and personnel.
  • Jeopardizing mission readiness for U.S. and 19 international partners.

Get Your PTMS Upgrade Now

Our Power and Thermal Management System (PTMS) integrates a conventional auxiliary power unit, environmental control system, and emergency power into a single system.

Why rip out and replace what already works? Upgrade what’s flying. Upgrade what’s proven. Upgrade what’s ready.

Fill in the form below and a Honeywell representative will contact you to discuss more